For heaters, the head camera follows draining the old unit with a hose, disconnecting lines, moving the tank with a dolly, positioning the new one, sweating or compression-fitting the water connections, wiring or gas-fitting, installing the T&P discharge line, filling, purging air, and lighting or powering up. For shower heads, the camera records removing the old head, cleaning the shower arm threads, wrapping tape in the right direction, hand tightening, and checking for drips at the joint.
Fixed cameras document the lifting and dolly work, which matters for anyone studying how a worker moves a heavy object through a tight space.
Each installation is delivered as an episode with labeled steps and success or failure tags. Hand and tool tracking are optional. We write everything to your storage in your schema, and all footage comes from consented, paid plumbers on real jobs, cleared for commercial model training.
Samples ship within a business day of your request.